Description
This powerpoint presentation begins by providing a brief overview of the city of Arlington, Texas, and its current water system. Reasons for a master plan and model update are provided, along with model development issues, and calibration andoperational issues. Various benefits are presented, and lessons learned include the following:field verify pressure plane boundariesprior to field testing;utilize billing data for initial demanddistribution;perform detailed review of geographic information system (GIS)connectivity again and again; and,field verify supervisory control and data acquisition (SCADA) measurements, where possible. Includes figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 11/01/2008
- Number of Pages:
- 29
- File Size:
- 1 file , 6.5 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus