Description
This powerpoint presentation begins by providing a brief overview of Spartanburg Water and its pro-active positionconcerning identification of aging infrastructure inneed of rehabilitation. A condition assessment of the Union Street pipeline is presented, along with Spartanburg Water responsibilities that included the following:provide insertion point(s)with 2″ diameter opening;SCDOT Coordination;media notification;traffic control during theinspection process; and,velocity control. Benefits of the leak condition assessment are provided.
Product Details
- Edition:
- Vol. – No.
- Published:
- 11/01/2008
- Number of Pages:
- 19
- File Size:
- 1 file , 1.9 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus